The Netherlands may not be a large producer when it comes to wind turbines , but TER LINDEN Craning, located in Doetinchem is highly experienced in the lifting and mounting of the wind turbines throughout Europe.
The erection of wind turbines with heights of 100 metres or more, blades longer than 45 meters and component weights over 75t are no exception to us.
To erect the wind turbine efficiently, all turbine parts, as well as the crane and an erection team have to be present on a just in time base. To insure this it takes months of preparation/planning: Acquiring the right permits, custom made health and safety plans, tailored lifting plans and site visits, etc.. This stage is critical for a smooth execution of the projects.

TER LINDEN craning is also specialized in project management.  The project manger is a single point of contact for the full project execution fase, including the transport and installation.

 