The Netherlands may not be a large player in the production of  wind turbines, but TER LINDEN Transport, located in Doetinchem is a leading service provider that transports over 200 wind turbines anually, all over Europe.
ter linden - mast snelweg  
The transport by road of the parts of wind turbines, towers of up to 100 metres high, rotor blades of 45 metres and machine houses of more than 75 tons takes months of accurate planning.

Surely when the transportation takes place through several European countries, timely preparation is required. Europe may be one trading area but in each country there are different rules for special transports. In Germany and Belgium we are only allowed to drive at night, in the Netherlands only during the day and in France every department has its own terms and regulations .
TER LINDEN started out as a tow and salvation company for trucks and since the early nineties has specialized in the transport of wind turbines. The prominent yellow trucks, of which most were specially designed for us can extend to a length of  almost 50 metres, enabling us to transport most wind turbine components on the market today.

The transport of wind turbines is not only a technical specialization. A third of the transport costs go into secondary businesses such as permits, transport guidance and possible police guidance. The effort is above all to control the logistics chain. When we arrive at a wind park with the tower sections and rotor blades, the crane and mechanics have to be there already. Even the transformer at the foot of the tower already has to be in place and checked, seeing as this part cannot fit through the door. We specialize ourselves more and more in improving the supply chain and taking care of the complete logistical planning for our clients.
ontwerp: a&m impact internetdiensten
Disclaimer